top of page

Wittenberg University HPER Center Nataorium Renovation

Springfield, OH

The natatorium renovation in the Health, Physical Education and Recreation Center included complete removal and replacement of the tile from the pool deck, locker rooms and training pool.

The existing monotone tile was replaced with white field tile accented with the school color red border and 13’ diameter tiger graphic.

The project also included:
- New additional timing system locations integrated with the existing system and scoreboard
- New additional diving platforms
- Repainting of pool bottom
- Repainting of walls
- Diving platform removal, refurbishment and reinstallation

bottom of page