top of page

Wittenberg University HPER Center Nataorium Renovation

Springfield, OH

The natatorium renovation in the Health, Physical Education and Recreation Center included complete removal and replacement of the tile from the pool deck, locker rooms and training pool.

The existing monotone tile was replaced with white field tile accented with the school color red border and 13’ diameter tiger graphic.

The project also included:
- New additional timing system locations integrated with the existing system and scoreboard
- New additional diving platforms
- Repainting of pool bottom
- Repainting of walls
- Diving platform removal, refurbishment and reinstallation

GET IN TOUCH:

937-323-4300

Main Office:

14 East Main Street, Suite 201,

Springfield, OH 45502

Branch Office:

120 1/2 S. Washington St., Suite 209,

Tiffin, OH 44883

937-765-8340

New Sign of Logo - Copy.jpg
  • Houzz
  • Facebook
  • Instagram

© 2025 by McCall Sharp Genet Architecture, LLC.

bottom of page